Starter network
1 charger
40%
weighted demand coverage
Longest gap: 36.4 nm
Selected sites
- Ganges
HarborGrid
Plan marine EV charging networks with deterministic optimization.
Synthetic demonstration data — not for navigation, engineering, permitting, utility interconnection, or investment decisions.
1 charger
40%
weighted demand coverage
Longest gap: 36.4 nm
3 chargers
92%
weighted demand coverage
Longest gap: 12.7 nm
5 chargers
100%
weighted demand coverage
Longest gap: 9.8 nm
Move the charger-budget slider to see which synthetic candidate facilities are selected by the deterministic optimizer.
Chargers
3
Weighted demand coverage
92%
Longest gap
12.7 nm
Demo confidence
50/100
Demo confidence: 50/100 — fixed because all current source data is synthetic.
Coverage improvement vs 1 charger: 52 percentage points
Longest-gap reduction vs 1 charger: 23.7 nm
Range circles show straight-line distance and may cross land. They are demonstration proxies, not navigable routes.
Loading map…
1 charger
40% weighted coverage
Longest gap: 36.4 nm
3 chargers
92% weighted coverage
Longest gap: 12.7 nm
Coverage improvement: 52 percentage points
Longest-gap reduction: 23.7 nm
HarborGrid compares candidate charging networks using weighted demand coverage and straight-line nautical-distance proxies. The optimizer—not AI—selects the sites.
The 10 nm usable-range assumption is for demonstration only and is not a certified vessel range.